Build your career where people make the difference. View our immediate openings and apply today.

Bedford Highlighting ReadySpan Bridge at PTBA’s Sustainable Trails Conference

Bedford Reinforced Plastics will highlight its ReadySpan bridge systems at the PTBA Sustainable Trails Conference, held March 19-21, 2024, in Lanier Islands, Georgia.

The ReadySpan pedestrian, equestrian and light vehicle bridges are lightweight, high-strength and designed to withstand the harshest outdoor conditions. FRP material is resistant to heat, high winds, rain, snow and saltwater. It won’t shrink, swell, warp, corrode or attract insects — outperforming wood and steel bridges year after year.

Cascade Locks, OR

ReadySpan bridges are ready for quick shipping whenever needed and easy to assemble upon arrival with a few common tools. ReadySpan bridges are also available completely pre-assembled for added installation convenience.

“Bedford ReadySpan bridges provide those in the trail and parks industry with a low-maintenance, cost-effective and long-lasting option when it comes to their bridge solutions,” said Eric Kidd, marketing director for Bedford Reinforced Plastics. “Whether the bridge is on a rugged ATV trail, community park or anything in between, the ReadySpan solution lasts decades longer and features safer conditions than bridges made of wood or steel – and without sacrificing any aesthetics in the process.”

ReadySpan bridges are available in a range of sizes and capable of meeting the demands of load carrying conditions.

Martin Hill ATV Trail – Bedford County, PA

ReadySpan bridge applications include:

  • State parks
  • Hiking and biking trails
  • ATV and equestrian trails
  • New and replacement installations

For real-world examples, visit this ReadySpan page. For more information, contact us or call (814) 623-8125